TODAY
Route 94: both directions, alternating lanes, 17th Street to Spring Street, 9:01 a.m. to 2:01 p.m., Botts' dot replacement.
Route 94: both directions, intermittent ramp closures, 28th Street to Lemon Grove, 9:01 a.m. to 2:01 p.m., Botts' dot replacement.
Route 94: both directions, one-way traffic control, Steele Canyon Road to Marron Valley Road, 5:01 a.m. to 2:01 p.m., concrete pour.
Route 67: both directions, one-way traffic control, Foster Truck Trail to Kalbaugh Street, 8:01 p.m. to 5:01 a.m. tomorrow, striping.
LONG-TERM CLOSURE:
Route 94: between Forrest Gate and Sheridan roads, one-way traffic control, 7:30 a.m. to 5 p.m., Monday-Friday, work scheduled to start today and last about one month, Campo Creek Bridge repairs.
Traffic information: Check out the traffic map at uniontrib.com before your morning or afternoon commute. Click on “Traffic” at the top of the page. Traffic information also is available by calling 511 or going to 511.sd.com, or to dot.ca.gov/dist11 and look under “Quick Links” then click on “Scheduled Road Closures.”